Conditional Lien Waiver — Progress Payment
State-specific Risk: High $1.99 Construction & Contractors
A subcontractor or supplier signs this to waive lien rights for a progress payment — effective only once that payment actually clears.
Buy by email — $1.99
Card checkout is being set up. Until then, buying takes one email: we reply with payment instructions and send the fill-in template (Word and PDF) as soon as payment lands.
About this form
A conditional waiver is the standard exchange during a job: the party being paid promises that, once the stated payment is received and clears, its lien and payment-bond rights are waived for the work covered through a stated date. Because it only takes effect on actual payment, it is the safer waiver to sign before the money lands. Several states prescribe the exact wording by statute, which is why this form carries a strong caution.
What's inside
- Claimant, customer and owner identification
- Project and job address
- Payment amount and through-date
- Conditional waiver language
- Exceptions and disputed claims reserved
- Signature
Who signs
Signed by the company waiving rights (the claimant), through an authorized signer. Notarization is required in a few states and optional in most.
Read this before you use it
Several states — including California, Texas, Arizona, Florida, Georgia, Michigan, Mississippi, Nevada, Utah and Wyoming — prescribe statutory lien-waiver wording, and a waiver that does not follow the statute can be void, or worse, read more broadly than intended. Some states also void waivers signed before payment. If your state has a statutory form, use that form instead of this one, and have a construction attorney check the waiver before it is exchanged on a large job.
Preview — the opening of the template
CONDITIONAL WAIVER AND RELEASE OF LIEN — PROGRESS PAYMENT [NOTE: IF THE STATE WHERE THE PROJECT IS LOCATED PRESCRIBES A STATUTORY WAIVER FORM, USE THE STATUTORY FORM INSTEAD OF THIS DOCUMENT.] Claimant (party waiving rights): [COMPANY NAME] Customer (party who hired Claimant): [NAME] Owner of the property: [OWNER NAME] Project / job address: [STREET ADDRESS, CITY, STATE, ZIP] Payment covered by this waiver: $[AMOUNT], by [CHECK NO. / ACH / OTHER], covering work performed through [THROUGH DATE] (the "Through Date"). 1. CONDITIONAL WAIVER. On receipt of the payment above, and once that payment has cleared the Claimant's bank, Claimant waives and releases: (a) any mechanic's lien Claimant has or may have on the Project for labor, services, equipment or materials furnished through the Through Date; and (b) any claim against a payment bond for that same work.
…the full template continues with every section listed above, with clearly marked blanks to fill in.
A note on state law
Parts of this document are shaped by state law. The warning box on this page flags the points to check, and for anything high-stakes the customized version through ECORPZ is the safer route.
Related forms
Subcontractor Agreement
Put in writing the deal between a general contractor and a subcontractor hired to perform part of a construction job.
Mixed Risk: High $1.99
Construction Change Order
Record a signed change to scope, price or time on a construction contract already in progress.
Mixed Risk: Caution $1.99
Unconditional Lien Waiver — Progress Payment
Waives lien rights immediately on signing for progress payments already received — used after the money is confirmed in hand.
State-specific Risk: High $1.99
Conditional Lien Waiver — Final Payment
Exchanged at project close-out: waives all lien rights for the whole job, effective only once the final payment clears.
State-specific Risk: High $1.99
Unconditional Lien Waiver — Final Payment
Confirms final payment is in hand and waives all lien rights for the entire job, effective immediately on signing.
State-specific Risk: High $1.99
Notice of Intent to Lien
Warn an owner (and often the general contractor) that a mechanic's lien will be recorded if a stated balance is not paid by a stated date.
State-specific Risk: High $1.99
Mechanic's Lien Claim — Guide & Preparation Worksheet
A step-by-step guide and fact worksheet for preparing a mechanic's lien claim — the claim itself is recorded on your county or state statutory form, not on this page.
State-specific Risk: High $1.99
Construction Proposal / Bid Form
A contractor's written, priced proposal for a construction job — scope, allowances, exclusions, validity period and deposit terms.
Mixed Risk: Caution $1.99
Punch List / Completion Checklist
List every unfinished or defective item found at the final walkthrough, with responsibility, due dates and sign-off when each item is fixed.
Generic Risk: Low $1.99
Work Order / Service Call Form
Authorize a single service visit or small repair in writing before work starts — work requested, rates, parts and the customer's signature.
Mixed Risk: Low $1.99
Certificate of Substantial Completion
Record the date a project became substantially complete — the date that starts warranty periods, ends delay exposure and opens lien and payment clocks.
Mixed Risk: Caution $1.99
Contractor Crew / Day Labor Agreement
Engage individual trade helpers and crew members as independent contractors for construction work, with classification, pay and safety terms in writing.
Mixed Risk: High $1.99
Construction Equipment Rental Agreement
Rent construction equipment or tools between businesses — rates, damage responsibility, fuel, return condition and liability in writing.
Mixed Risk: Caution $1.99
EDOXZ provides document templates and general information only. EDOXZ is not a law firm, and its templates are not legal advice and are not a substitute for a licensed attorney in your state. State law controls many of these documents — for high-risk forms, have a licensed attorney in your state review the completed document before you sign or send it.